OPERATION AND MAINTENANCE PLAN
AND
LONG-TERM POLLUTION PREVENTION PLAN
ESSEX CROSSING
#232 ESSEX STREET
BEVERLY, MASSACHUSETTS
June 19, 2014
Revised March 10, 2015

GENERAL
The management plan incorporates a combination of the following chain of structural best
management practices to improve water quality of the stormwater runoff from the proposed
roadway and other impervious surfaces, and control runoff to downgradient areas.
1. Deep Sump Catch Basins with Hoods, Oil and Gas Traps
2. STC 450i Stormceptors
3. Granite Curb Level Spreader
4. Cultec Subsurface Chambers
5. Infiltration Basin
These stormwater management facilities have unique characteristics, uses, planning
considerations and maintenance requirements. The maintenance requirements, as suggested
by the DEP in “Volume 2, Chapter 2: Structural BMP Specifications for the Massachusetts
Stormwater Handbook”, and the suggested schedules are summarized in the following sections.
It is suggested that the following guidelines be adhered to following completion of the project
and then adjusted, as necessary, based on the results of the required inspections and based on
evidence of maintenance history. The owner can submit a revised maintenance schedule to the
Engineering Division for review and approval. The maintenance and repair reports will be
submitted to the Engineering Division and the Conservation Commission annually by January
15th. There will be an inspection conducted for all components of the stormwater management
system for major storm events equal to or exceeding 2 inches.

Deep Sump Catch Basins with Hood, Oil and Gas Traps
The catch basins must be inspected, and if necessary, cleaned four (4) times a year including at
the end of foliage and snow removal season. Inspections shall consist of two tasks: measuring
and recording depth of sediment deposits contained within the basin, and inspecting structural
basin, hood, gas trap, and sump components for damage. The inspection frequency may need
to be increased if catch basins are regularly found to contain a significant amount of trash and
sediment.
 Basins shall be cleaned at least annually using a vacuum truck or when they are found
to contain a significant amount of deposits (whenever the deposit depth is greater than

1

Essex Crossing, #232 Essex Street, Beverly, MA
Operation and Maintenance Plan / Long-Term Pollution Prevention Plan
June 19, 2014, revised March 10, 2015

or equal to one-half the depth from the bottom of the lowest invert) and there is a
significant amount of trash, as specified in the MADEP Stormwater Handbook, Volume
2, Chapter 2, pages 3 through 5.
 Damaged basin components shall be repaired as soon after discovery as possible to
ensure that the catch basin functions properly.
 Removed basin deposits must be handled as specified in the attached page (Structural
BMPs – Volume 2, Chapter 2, page 5) from the MADEP Stormwater Handbook.

Stormceptor STC 450i Water Quality Chamber
Regulating the sediment and petroleum product input to the proposed subsurface water
quality system is the priority maintenance activity. Sediments and any oil spillage should be
trapped and removed before they reach the chambers.


Stormceptor chamber maintenance shall be performed on a regular basis as
recommended by the manufacturer (described in the attached excerpt from the
Stormceptor Maintenance Brochure obtained from the Stormceptor website
(www.stormceptor.com) and as summarized below.



Sediment removal is recommended annually, but is likely to vary widely based on
site conditions and loadings. Typical maintenance cleaning can be done with a
vacuum truck. Inspection for each of the Stormceptor units will include a
quantification of the sediment load and oil and grease volumes. This is easily made
from the surface with a tube dipstick with ball valve inserted through the cleanout
pipe or other access port. Depths of sediment indicating maintenance are presented
in the following table for the various models. Inspection of the internal structure
should be part of the routine inspection plan. The units are designed to accept 15%
of their capacity in solids annually based on maximum drainage area loading.
Removal of sediment, oils, and grease from the system will depend on rates of
accumulation. All sediment and oil waste materials shall be disposed of in
accordance with all Federal, State, and Local regulations.

REQUIRED MAINTENANCE *

Model

Sediment Depth (in.)

Stormceptor Model 450i

8*

* based on 15% of the interceptor’s sediment storage

2

Essex Crossing, #232 Essex Street, Beverly, MA
Operation and Maintenance Plan / Long-Term Pollution Prevention Plan
June 19, 2014, revised March 10, 2015

Cultec R-330XL Subsurface Chambers
Recharge systems are prone to failure due to clogging. Adherence to this aggressive
maintenance plan and schedule preserves effectiveness of the system.
 Refer to the manufacture’s “Operation and Maintenance Guidelines” brochure (attached)
for maintenance description.
 The subsurface system will be inspected after every major storm for the first few months
after construction to ensure that proper function has been achieved. Thereafter, the
area will be inspected at least four times a year. Water levels in the chambers should be
recorded over several days to check drainage.
 The inspection ports for the recharger system will be inspected after every major storm
and the collected debris removed.
 Any required cleaning or other action will be documented and completed within seven
business days.
 Ponded water inside the chambers (as visible from the inspection ports) after 24 hours
or several days most likely indicates that the bottoms of the pipes are clogged.
 The inspection, cleaning, and maintenance responsibility for the site drainage system
shall belong to the property owner, designated Homeowners Association (if any), and
any designated Property Manager.
 If inspection indicates that replacement or major repair is required, a work plan will be
submitted within 7 days to the Engineering Division for review and repair.

Infiltration Basin
 Inspect after every major storm for the first few months after construction to ensure
proper stabilization and function. Thereafter, the basin should be inspected at least
twice a year.
 Pretreatment structures should be inspected and the accumulated sediment
removed at least twice a year, ideally after every major rainfall event or every other
month.
 The grass in the basin, on the side slopes and in the buffer areas should be mowed,
and grass clippings, organic matter, and accumulated trash and debris removed at
least twice during the growing season.
 Eroded or barren spots should be reseeded immediately after inspection to prevent
additional erosion and accumulation of sediment.

3

Essex Crossing, #232 Essex Street, Beverly, MA
Operation and Maintenance Plan / Long-Term Pollution Prevention Plan
June 19, 2014, revised March 10, 2015

 Sediment should be removed from the basin as necessary. Removal procedures
should not take place until the floor of the basin is thoroughly dry.

Granite Curb Level Spreader
The granite curb level spreader should be checked periodically after every major storm to
determine if the berm has been damaged and to determine that the design conditions have not
changed. Any detrimental sediment accumulation should be removed. If riling has taken place
on the berm or adjacent to the level spreader, the damage should be repaired as soon as
possible. Leaf litter shall be removed from the level spreader area. The vegetation in the vicinity
downgradient of the spreader will be periodically inspected and fertilized to maintain healthy
dense growth.

Removal of Siltation Controls
All siltation controls, including, but not limited to, hay bales and silt fence, shall be removed,
with the approval of the Beverly City Engineering Department, as soon as practical after
paving, re-vegetation and total stabilization of the site. Unvegetated areas remaining in the
area of the siltation controls shall be loamed and seeded with the appropriate groundcover
to insure re-vegetation as rapidly as possible after the removal of the siltation controls. In
the case of all proposed stormwater management facilities, during construction of the
proposed stormwater management system the developer shall be the owner and party
responsible for maintenance.

Spill Emergency Response and Shutoff Plan
In the event of an accidental spill of gasoline or oil, there shall provided, and kept on site,
36” x 60” “Drain Protector II” rectangular catch basin covers and 10-foot long “Spill berm” to
provide protection for the drainage system. Both items are available from “Supply Line
Direct”. These items will be stored on site in an easily accessible location and personnel will
be instructed in their proper use. The City of Beverly shall be responsible for producing and
enacting a Spill Emergency Response and Shutoff Plan for the Right-of-Way drainage
system.

Ownership / Maintenance Responsibility
The developer and owner, DUC Residential, LLC, shall be the party responsible for
maintenance of the stormwater management facilities during development construction. Once
the roadway is accepted by the City of Beverly, both the City and Homeowners Association will
be responsible for maintaining the drainage and stormwater BMP systems in the Essex
Crossing subdivision. Specifically, the City shall maintain all drainage system pipes and
structures within the Right-of-Way (Pond View Lane), except for the Stormceptor 450i unit
located in the manhole at Station 3+45, and the Homeowners Association shall maintain all
other subdivision drainage lines and stormwater BMP structures, including the two Stormceptor
450i units at Stations 1+05 and 3+45, the infiltration basin at the rear of lots #14 and #15, and

4

Essex Crossing, #232 Essex Street, Beverly, MA
Operation and Maintenance Plan / Long-Term Pollution Prevention Plan
June 19, 2014, revised March 10, 2015

the subsurface Cultec infiltration system and associated level spreader located adjacent to
Kelleher’s Pond. The drainage and stormwater BMP systems are shown on the Hayes
Engineering, Inc. plan titled “OSRD Site & Utility Plan, Essex Crossing, Beverly, Mass.”, revised
through 9/30/14.
Standard #4: Water Quality
The Long-Term Pollution Prevention Plan
 Good housekeeping practices: Prevent or reduce pollutant runoff from the project
development through the use of street sweeping, erosion and catch basin cleaning. It
should be noted that we are not seeking credit for TSS removal with street sweeping for
this project.
 Provisions for storing materials and waste products inside or under cover: All materials
stored on site shall be stored in a neat and orderly fashion in their appropriate containers
and under a roof or other secure enclosure. Waste products should be placed in secure
receptacles until they are emptied by a licensed solid waste management company in
Massachusetts.
 Requirements for routine inspections and maintenance of stormwater BMPs: Follow the
guidelines outlined above.
 Spill prevention and response plans:



o

Prevention: All materials stored on site shall be stored in a neat and orderly
fashion in their appropriate containers and under a roof or other secure
enclosure. Products will be kept in their original containers with the original
manufacturer’s label. Products should not be mixed with one another unless
recommended by the manufacturer. If possible, all of the product should be used
up before disposing of the container. The manufacturer’s recommendations for
proper use and disposal should be followed.

o

Response: Manufacturer’s recommended methods for cleanup shall be followed.
Spills should be cleaned up immediately after discovery. The spill area shall be
kept well ventilated and personnel shall wear appropriate protective clothing to
prevent injury from contact with a hazardous substance. Spills of toxic or
hazardous material shall be reported to the appropriate State and/or local
authority in accordance with local and/or State regulations.

Provisions for maintenance of lawns, gardens, and other landscaped areas:
Maintenance of the landscaped areas shall be scheduled and supervised by the
developer/future owner and their designated property manager (if any).

 Requirements for storage and use of fertilizers, herbicides and pesticides will be in
compliance with all applied laws:
o

Fertilizers: Fertilizers shall be applied in the minimum amounts recommended by
the manufacturer. Once applied, fertilizers shall be worked into the soil to limit

5

Essex Crossing, #232 Essex Street, Beverly, MA
Operation and Maintenance Plan / Long-Term Pollution Prevention Plan
June 19, 2014, revised March 10, 2015

exposure to stormwater. Storage shall be under a roof or other secure
enclosure. The contents of any partially-used bags of fertilizer shall be
transferred to a sealable plastic bag or bin to avoid spills.
o

Herbicides and Pesticides: Store herbicides and pesticides in original containers
that are closed and labeled, in a secure area out of reach of children and pets.
Avoid storing in damp areas where containers may become moist or rusty.
Herbicides and pesticides shall not be stored near food. Follow the label
instructions strictly about where and how much to apply. Do not put herbicides
and pesticides in the trash or down the drain. Use rubber gloves when handling,
and use an appropriate cartridge mask if using products extensively.

 Provisions for solid waste management: Waste products shall be placed in secure
receptacles until they are emptied by a licensed solid waste management company in
Massachusetts.
 Pet waste management provisions: The responsibility of managing pet waste lies with
the individual who own pets to perform the clean up and disposal of their pet waste.
 Provisions for operation and management of septic systems: Not applicable. This project
will have sewer service.
 Snow disposal and plowing plans relative to Wetland Resource Areas: Snow disposal
will be in accordance with the Department of Environmental Protection, Bureau of
Resource Protection, Snow Disposal Guidelines, Guideline No. BRPG01-01, effective
March 8, 2001. In general, snow will be plowed in accordance with standard operating
procedures. During construction, snow will be plowed and stored in designated areas
adjacent to the roadways.
 Winter road salt and/or sand use and storage restrictions:
o

Salt/Sand: Whenever possible, use of environmentally friendly alternatives, i.e.
calcium chloride and sand instead of salt for melting ice, will be considered.

 Street sweeping schedules: In order to minimize the Total Suspended Solids (TSS) load
to the deep-sump catch basins and those BMPs down gradient, street sweeping will be
performed at least four (4) times per year during construction. Upon acceptance of the
road by the City of Beverly, street sweeping will be conducted at the scheduled
frequency set by the Department of Public Services,

Standard #10: Illicit Discharge Statement
Provisions for prevention of illicit discharges to the stormwater management systems:
There are no proposed illicit discharges to the proposed stormwater management
systems. However, by definition, an illicit discharge does not include discharges from the
following activities or facilities: firefighting, water-line flushing, landscape irrigation,

6

Essex Crossing, #232 Essex Street, Beverly, MA
Operation and Maintenance Plan / Long-Term Pollution Prevention Plan
June 19, 2014, revised March 10, 2015

uncontaminated groundwater, potable water sources, foundation drains, air conditioning
condensation, footing drains, water used for street washing and water used to clean buildings
without detergents. See the information presented in the Hayes Engineering, Inc. “Essex
Crossing” plan set for the proposed locations of the drainage system, stormwater management
BMPs, and utilities. Upon review of said plans, it is evident that there are no entries of illicit
discharges into the stormwater management system. The current owner, City of Beverly and
Homeowners Association shall be responsible for verifying that there are no illicit discharges to
the stormwater management system (discharges of water into the system other than
stormwater) after the system has been constructed.
 Documentation that stormwater BMPs are designed to provide for shutdown and
containment in the event of a spill or discharges to or near critical areas, or from land
uses with higher potential pollutant loads (LUHPPL): The project does not discharge to
or near critical areas and is not a LUHPPL.
 Training for staff or personnel involved with implementing Long-Term Pollution
Prevention Plan: The responsibility lies with the City of Beverly once the road is
accepted, the Homeowners Association, and any designated Supervisor or Property
Manager.
 List of emergency contacts for implementing Long-Term Pollution Prevention Plan for
the subdivision road: The responsibility lies with the City of Beverly once the roads are
accepted, any Homeowners Association, any designated Supervisor or Property
Manager, and any designated Site Supervisor or Property Manager during construction
and post construction pollution control.

Current Owner / Applicant / Developer:
DUC Residential, LLC
c/o Paul DiBiase
P.O.Box780
Lynnfield, MA 01940
(781) 334-9899

7

Essex Crossing, #232 Essex Street, Beverly, MA
Operation and Maintenance Plan / Long-Term Pollution Prevention Plan
June 19, 2014

LONG TERM INSPECTION AND MAINTENANCE REPORT FORM
ESSEX CROSSING
#232 ESSEX STREET
BEVERLY, MASSACHUSETTS
INSPECTIONS TO BE CONDUCTED AT THE FREQUENCY SPECIFIED IN THE
OPERATION AND MAINTENANCE PLAN AND ORDER OF CONDITIONS

Maintenance and repair reports must be submitted to the Engineering Division and
Conservation Commission annually by January 15th.
Date: ________________
Inspected By: _____________________________
Days Since Last Rainfall: ___________

BMP

Catch Basins
(Inspect Grates,
Basin Structure,
Hood, and Gas Trap)

Amount of Last Rainfall: _____________

BMP
Installed As
Designed?

BMP
Maintenance
Required?

(circle one)

(circle one)

Yes

No

Yes

Depth
Sediment
Build-Up

Corrective Action
Needed
and Notes

No

Remarks:
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________

1

Essex Crossing, #232 Essex Street, Beverly, MA
Operation and Maintenance Plan / Long-Term Pollution Prevention Plan
June 19, 2014

LONG TERM INSPECTION AND MAINTENANCE REPORT FORM
ESSEX CROSSING
#232 ESSEX STREET
BEVERLY, MASSACHUSETTS
INSPECTIONS TO BE CONDUCTED AT THE FREQUENCY SPECIFIED IN THE
OPERATION AND MAINTENANCE PLAN AND ORDER OF CONDITIONS

Maintenance and repair reports must be submitted to the Engineering Division and
Conservation Commission annually by January 15th.
Date: ________________
Inspected By: _____________________________
Days Since Last Rainfall: ___________

BMP

Stormceptor
STC 450i

Amount of Last Rainfall: _____________

BMP
Installed As
Designed?

BMP
Maintenance
Required?

(circle one)

(circle one)

Yes

No

Yes

Depth
Sediment
Build-Up

Corrective Action
Needed
and Notes

No

Remarks:
____________________________________________________________________
____________________________________________________________________
____________________________________________________________________

2

Essex Crossing, #232 Essex Street, Beverly, MA
Operation and Maintenance Plan / Long-Term Pollution Prevention Plan
June 19, 2014

LONG TERM INSPECTION AND MAINTENANCE REPORT FORM
ESSEX CROSSING
#232 ESSEX STREET
BEVERLY, MASSACHUSETTS

INSPECTIONS TO BE CONDUCTED AT THE FREQUENCY SPECIFIED IN THE
OPERATION AND MAINTENANCE PLAN AND ORDER OF CONDITIONS

Maintenance and repair reports must be submitted to the Engineering Division and
Conservation Commission annually by January 15th
Date: ________________
Inspected By: _____________________________
Days Since Last Rainfall:

_________________ Amount of Last Rainfall: _____________

Cultec Subsurface Infiltration System
Refer to Cultec O. & M. Manual For Maintenance Requirements and Sample Log
Chamber Conditions

Maintenance Performed

Sediment Depth

Remarks:
____________________________________________________________________
____________________________________________________________________

3

Essex Crossing, #232 Essex Street, Beverly, MA
Operation and Maintenance Plan / Long-Term Pollution Prevention Plan
June 19, 2014

LONG TERM INSPECTION AND MAINTENANCE REPORT FORM
ESSEX CROSSING
#232 ESSEX STREET
BEVERLY, MASSACHUSETTS

INSPECTIONS TO BE CONDUCTED AT THE FREQUENCY SPECIFIED IN THE
FACILITY OPERATION AND MAINTENANCE PLAN AND ORDER OF CONDITIONS

Maintenance and repair reports must be submitted to the Engineering Division and
Conservation Commission annually by January 15th
Date: ________________
Inspected By: _____________________________
Days Since Last Rainfall:

_________________ Amount of Last Rainfall: _____________

Granite Curb Level Spreader
Curb and Riprap Conditions

Maintenance Performed

Sediment Depth

Remarks:
____________________________________________________________________
____________________________________________________________________

4

Last updated: